The Lamara Project – Phase 1

The Lamara Project Phase 1 involved drilling a borehole near an existing unused water pipeline, installing solar panels and a solar pump, building a guard house, as well as a water tank and a distribution tap.  Once this was complete, it was connected to the existing pipeline and pumped to a local school where a new 100,000 liter holding tank has been installed.  There are 2 more phases to the Lamara Project.